1/8/2022 | 7326909807 | SCREW ELEMENTS (TOTAL 84 PCS) FOR EXTRUDER OF EXTRUSION PRODUCTION LINE, IS A STAINLESS PART. BECOME . MANUFACTURED BY THE METHOD OF TURNING, INTENDED FOR MIXING RAW MATERIALS COMING INTO THE EXTRUDER, GENERAL | 140 | 35658.7 | India | MOSCOW RUSSIA | PROMAKTIV LLC |
1/26/2022 | 7308909809 | 20 M3 SHARPENING HOPPER, NEW (2021 YV.), MAXIMUM CAPACITY 210 T/H, NEW, SERVES TO ENSURE UNINTERRUPTED LOADING OF RAW MATERIALS BY THE FRONT LOADER INTO THE CRUSHER. MADE FROM STRUCTURAL STEEL. EQUIPPED WITH SENSOR | 5928 | 31594.1 | India | ST PETERSBURG RUSSIA | NJSC YUG MINERALS IN MAYKOP |
1/13/2022 | 7308909809 | 20 M3 LEVELING HOPPER, NEW, SERVES TO ENSURE UNINTERRUPTED LOADING OF RAW MATERIALS BY THE FRONT LOADER INTO THE CRUSHER. MAXIMUM CAPACITY 210 T/H. MADE FROM STRUCTURAL STEEL. EQUIPPED WITH LEVEL SENSORS. DELIVERED | 7117.3 | 34819.9 | India | ST PETERSBURG RUSSIA | NJSC YUG MINERALS IN MAYKOP |
1/19/2022 | 7326909807 | PRODUCTS FROM CORROSION-RESISTANT STEEL MANUFACTURED BY THE METHOD OF COMBINED MECHANICAL PROCESSING (CUTTING, WELDING, DRILLING, TURNING) FOR INSTALLATION OF THE PYROLYSIS UNIT FOR MIXED RAW MATERIALS OF THE AMUR GAS CHEMICAL COMPLEX | 41.51 | 287.44 | India | FREE | AMUR MCC LLC |
1/10/2022 | 7326909807 | SCREW ELEMENTS (TOTAL 84 PCS) FOR EXTRUDER OF EXTRUSION PRODUCTION LINE, IS A STAINLESS PART. BECOME . MANUFACTURED BY THE METHOD OF TURNING, INTENDED FOR MIXING RAW MATERIALS COMING INTO THE EXTRUDER, GENERAL | 140 | 35659.9 | India | MOSCOW RUSSIA | PROMAKTIV LLC |