1/10/2022 | 8411990098 | PARTS INTENDED FOR REPAIR OF GAS TURBINE INSTALLATION (GTU) MOD. V94.2/GTE-160, CAPACITY 185 MW, INSTALLED AT CHPP-27 OF PJSC MOSENERGO BRANCH: | 302 | 53899.2 | Italy | GENOA | ANSALDO ENERGIA RUSSIA LLC |
1/23/2022 | 8411990019 | PARTS OF EQUIPMENT OF SUBPOSITIONS 8411 82 200 AND 8411 82 600, FOR 29.31 MW SGT-700 GAS TURBINE PLANT | 47.17 | 76716.9 | Italy | FINSPONG | SIEMENS ENERGETIKA LLC |
1/21/2022 | 8411990098 | PARTS INTENDED FOR REPAIR OF GAS TURBINE UNIT (GTU) MOD. | 864 | 382228.3 | Italy | GENOA | ANSALDO ENERGIA RUSSIA LLC |
1/21/2022 | 8411990098 | PARTS INTENDED FOR REPAIR OF GAS TURBINE INSTALLATION (GTU) MOD. GAS TURBINE COMPRESSOR | 1243.3 | 139159.3 | Italy | GENOA | ANSALDO ENERGIA RUSSIA LLC |
1/31/2022 | 8411990019 | COMPONENT PARTS FOR THE MS5002E GAS TURBINE PLANT WITH A CAPACITY OF 32 MW, THE ANALOGUES OF WHICH ARE NOT MANUFACTURED IN THE RUSSIAN FEDERATION, ARE SUPPLIED IN THICK-WALLED WOODEN BOXES WITH SPECIAL PACKAGING MATERIAL (TYPE SCOVTIROFILM - PACKAGING) | 3640 | 900475.3 | Italy | FLORENCE ITALY | REP HOLDING JSC |
1/20/2022 | 8414900000 | PARTS OF GAS COMPRESSOR OF GAS TURBINE INSTALLATION OF CIVIL PURPOSE MS5002E WITH 32MW CAPACITY. SUPPLIED FREE OF CHARGE TO REPLACE A PREVIOUSLY IMPORTED DEFECTIVE GOODS | 30 | 3878.2 | Italy | ST PETERSBURG RUSSIA | REP HOLDING JSC |
1/10/2022 | 8411990098 | PARTS INTENDED FOR REPAIR OF GAS TURBINE UNIT (GTU) MOD. V94.2/GTE-160, CAPACITY 185 MW, INSTALLED AT CHPP-27 OF PJSC MOSENERGO BRANCH: | 10 | 1501.52 | Italy | GENOA | ANSALDO ENERGIA RUSSIA LLC |