1/11/2022 | 3824999609 | DRILLING FLUID ADDITIVE GELTONE II IS USED IN THE OIL AND GAS COMPLEX FOR THE PREPARATION OF DRILLING FLUID DURING THE CONSTRUCTION (DRILLING) OF WELLS, WHEN CARRYING OUT PLUGGING WORKS, WHEN TESTING, DEVELOPING AND REPAIRING WELLS, WHEN CARRYING OUT | 145952 | 306266.3 | Egypt | Unknown | BRANCH OF THE COMPANY HALLIBURTON INTERNATIONAL GMBH SWISS CONFEDERATION |
1/25/2022 | 3824999608 | DRILLING FLUID ADDITIVE GELTONE II IS USED IN THE OIL AND GAS COMPLEX FOR THE PREPARATION OF DRILLING FLUID DURING THE CONSTRUCTION (DRILLING) OF WELLS, WHEN CARRYING OUT PLUGGING WORKS, WHEN TESTING, DEVELOPING AND REPAIRING WELLS, WHEN CARRYING OUT | 27366 | 80534.8 | Egypt | Unknown | BRANCH OF THE COMPANY HALLIBURTON INTERNATIONAL GMBH SWISS CONFEDERATION |
1/24/2022 | 3824999608 | ADDITIVE FOR DRILLING FLUID BARADEMUL W-461 , FOR USE IN THE OIL AND GAS COMPLEX DURING THE CONSTRUCTION (DRILLING) OF WELLS, WHILE PLUGGING WORKS AT WELLS, DURING TESTING, DEVELOPING, REPAIRING WELLS, WHILE CARRYING OUT HYDRAULIC FRACTURING, | 16192 | 265948.6 | Belgium | Unknown | BRANCH OF THE COMPANY HALLIBURTON INTERNATIONAL GMBH SWISS CONFEDERATION |
1/18/2022 | 3824999208 | ADDITIVE TO DRILLING MUD BARACOR 100 IS USED IN THE OIL AND GAS COMPLEX FOR THE PREPARATION OF SOLUTIONS DURING THE CONSTRUCTION (DRILLING) OF WELLS, WHEN PLUGGING WORKS AT WELLS, TESTING, DEVELOPING AND REPAIRING WELLS, AS WELL AS | 33824 | 48726.7 | India | UNKNOWN | BRANCH OF THE COMPANY HALLIBURTON INTERNATIONAL GMBH SWISS CONFEDERATION |
1/18/2022 | 3824999208 | DRILLING FLUID ADDITIVE EZ MUL NT , USED BY OIL AND GAS COMPLEX FOR PREPARING DRILLING FLUID DURING CONSTRUCTION (DRILLING) OF WELLS, CARRYING OUT PLUGGING WORKS, DEVELOPMENT AND REPAIR OF WELLS, NOT WASTE, IN TANKS EUROCUBES OF 275 | 163260 | 529960 | United Kingdom | UNKNOWN | BRANCH OF THE COMPANY HALLIBURTON INTERNATIONAL GMBH SWISS CONFEDERATION |