1/18/2022 | 8431498009 | PART OF THE CRANE MANIPULATOR INSTALLATION - BOOM ASSEMBLY, USED, COMBINED MANUFACTURING METHOD (ASSEMBLY, CUTTING, WELDING), FUNCTION - BASIS FOR FASTENING EQUIPMENT (CABLES, HOOK, LEVER) FOR LOAD LIFTING. OPERATING PRINCIPLE - BOOM | 930 | 4653 | Japan | VLADIVISTOK RUSSIA | VLADSHABTEKHHIKA LLC |
1/4/2022 | 8431498009 | SPARE PARTS FOR CRANE MANIPULATOR INSTALLATIONS: CRANE BOOM 1886-1 WITH A LOADING CAPACITY OF 8 TONS, CONSISTING OF 6 SECTIONS COMPLETE WITH SPARE PARTS FOR ASSEMBLY, ASSEMBLY WITH CABLE DRUM, LIMIT SWITCH, SINGLE HYDRAULIC LOCK, DESCRIPTION | 6240 | 39024.8 | China | DALIAN CHINA PORT | SPETSTORG LLC |
1/4/2022 | 8431498009 | SPARE PARTS FOR CRANE MANIPULATOR INSTALLATIONS: CRANE BOOM 1886-2 WITH A LOAD CAPACITY OF 8 TONS, CONSISTING OF 6 SECTIONS COMPLETE WITH SPARE PARTS FOR ASSEMBLY, ASSEMBLY WITH CABLE DRUM, LIMIT SWITCH, SINGLE HYDRAULIC LOCK, DESCRIPTION | 7800 | 48780 | China | DALIAN CHINA PORT | SPETSTORG LLC |
1/25/2022 | 8431498009 | CRANE PART:CABLE-LAYING CHAIN ASSEMBLY FOR CONTAINER CRANE, DESIGNED FOR PLACING CABLES IN IT AND SERVES TO CONNECT MOVING ELECTROMECHANICAL DEVICES ON THE CRANE, IMPORTED AS ACCESSORIES FOR PRODUCTION | 63.2 | 1835.29 | Italy | MONZA | BALTKRAN JSC |
1/4/2022 | 8431498009 | SPARE PARTS FOR CRANE MANIPULATOR INSTALLATIONS: CRANE BOOM 1153 WITH A LOADING CAPACITY OF 5 TONS, CONSISTING OF 3 SECTIONS COMPLETE WITH SPARE PARTS FOR ASSEMBLY, ASSEMBLY WITH CABLE DRUM, LIMIT SWITCH, SINGLE HYDRAULIC LOCK, PART NUMBER | 545 | 6138.81 | China | DALIAN CHINA PORT | SPETSTORG LLC |
1/25/2022 | 8431498009 | CRANE PARTS: CABLE SUSPENSION ASSEMBLY DESIGNED TO MOVE THE CABLE ALONG THE CRANE DURING OPERATION, TO ENSURE SAFETY DURING TRANSPORT SUPPLIED ON A NON-RETURNABLE METAL FRAME WITH A WOODEN DECK (BELOW | 1229.26 | 31672.7 | Poland | BYDGOSCH POLAND | BALTKRAN JSC |
1/13/2022 | 8431498009 | PART OF MANIPULATOR CRANE INSTALLATION-BOOM ASSEMBLY, USED: TADANO No. EP7107 (411-023-10311). COMBINED MANUFACTURING METHOD (ASSEMBLY, CUTTING, WELDING), FUNCTION-BASIS FOR FASTENING EQUIPMENT (CABLES, HOOK, LEVER) FOR LOAD LIFT, | 1170 | 5865.5 | Japan | VLADIVISTOK RUSSIA | ATLANTIC LIPETSK LLC |
1/25/2022 | 8431498009 | PARTS OF EQUIPMENT FOR SUSPENDED CABLE SYSTEMS, ASSEMBLY MANUFACTURING METHOD, NON-MILITARY PURPOSE, ARE USED IN REPAIR AND MAINTENANCE OF PREVIOUSLY IMPORTED CMU EQUIPMENT, IN PARTIALLY DISASSEMBLED FOR EASY TRANSPORTATION: | 590 | 4911.02 | Italy | NEMBRO BERGAMO | FERRO OTTIMO LLC |
1/24/2022 | 8431498009 | PARTS OF THE CRANE SUSPENDED CABLE SYSTEM IN GALVANIZED STEEL, NOT CAST, FOR SUSPENSION OF THE CABLE AND ITS MOVEMENT ALONG THE CRANE, ASSEMBLED TO EXCLUDING FRICTION OF THE CABLE INSULATION, CIVIL USE: | 6.51 | 682.84 | Germany | WEIL AM RHEIN GERMANY | INDUSTRIAL COMPONENTS LLC |