1/12/2022 | 4407129906 | WOODEN MATERIALS (BOARD, BEAM), OBTAINED BY SAWING ALONG, UNSANDED, UNPLANED, ROUGH, WITHOUT JOINTS INTO A THORN. FROM: SIBERIAN FIR (ABIES SIBIRICA.). PAID VOLUME 0.44 M3 VOLUME UNDER THE CONTRACT 630M3 VOLUME IS DETERMINED BY FR 1.27.2014. | 219 | 66.23 | Azerbaijan | ST SAMUR EX SEV KAV Railway | SP MELNIKOV MAXIM MIKHAILOVICH |
1/12/2022 | 4407129906 | WOODEN MATERIALS (BOARD, BEAM), OBTAINED BY SAWING ALONG, UNSANDED, UNPLANED, ROUGH, WITHOUT JOINTS INTO A THORN. FROM SIBERIAN SPRUCE (PICEA OBOVATA.). PAID VOLUME 16.83 M3 VOLUME UNDER THE CONTRACT 630M3 VOLUME IS DETERMINED UNDER FR 1.27.2014.171 | 10011 | 2334.07 | Azerbaijan | ST SAMUR EX SEV KAV Railway | SP MELNIKOV MAXIM MIKHAILOVICH |
1/13/2022 | 4407129906 | WOODEN MATERIALS (BOARD, BEAM), OBTAINED BY SAWING ALONG, UNSANDED, UNPLANED, ROUGH, WITHOUT JOINTS INTO A THORN. FROM SIBERIAN SPRUCE (PICEA OBOVATA.). PAID VOLUME 14.54 M3 VOLUME UNDER THE CONTRACT 630M3 VOLUME IS DETERMINED IN ACCORDANCE WITH FR 1.27.2014.171 | 8636 | 2334.17 | Azerbaijan | ST SAMUR EX SEV KAV Railway | SP MELNIKOV MAXIM MIKHAILOVICH |
1/20/2022 | 4407129906 | WOODEN MATERIALS (BOARD, BEAM), OBTAINED BY SAWING ALONG, UNSANDED, UNPLANED, ROUGH, WITHOUT JOINTS INTO A THORN. FROM SIBERIAN SPRUCE (PICEA OBOVATA.). PAID VOLUME 14.62 M3 VOLUME UNDER THE CONTRACT 630M3 VOLUME IS DETERMINED UNDER FR 1.27.2014.171 | 8693 | 2332.87 | Azerbaijan | ST SAMUR EX SEV KAV Railway | SP MELNIKOV MAXIM MIKHAILOVICH |
1/13/2022 | 4407129906 | WOODEN MATERIALS (BOARD, BEAM), OBTAINED BY SAWING ALONG, UNSANDED, UNPLANED, ROUGH, WITHOUT JOINTS INTO A THORN. FROM: SIBERIAN FIR (ABIES SIBIRICA.). PAID VOLUME 0.44 M3 VOLUME UNDER THE CONTRACT 630M3 VOLUME IS DETERMINED BY FR 1.27.2014. | 219 | 66.33 | Azerbaijan | ST SAMUR EX SEV KAV Railway | SP MELNIKOV MAXIM MIKHAILOVICH |
1/20/2022 | 4407129906 | WOODEN MATERIALS (BOARD, BEAM), OBTAINED BY SAWING ALONG, UNSANDED, UNPLANED, ROUGH, WITHOUT JOINTS INTO A THORN. FROM: SIBERIAN FIR (ABIES SIBIRICA.). PAID VOLUME 0.44 M3 VOLUME UNDER THE CONTRACT 630M3 VOLUME IS DETERMINED BY FR 1.27.2014. | 219 | 65.03 | Azerbaijan | ST SAMUR EX SEV KAV Railway | SP MELNIKOV MAXIM MIKHAILOVICH |