1/26/2022 | 8413910008 | PARTS OF SUBMERSIBLE PUMP INSTALLATIONS. ARE DESIGNED FOR SUPPLY OF FORMATION LIQUID TO THE PUMP AND ITS WORK ON PUMPING OF FORMATION LIQUID FROM WELLS. AVAILABILITY OF THE FLOW METER - NO. APPLICATION PETROLEUM INDUSTRY. | 55 | 2897.41 | Egypt | ALEXANADRIA | BISCOM INTERNATIONAL AG ON ORDER FOR CJSC NOVOMET PERM |
1/28/2022 | 8421290009 | SLUDGE TRAP. INTENDED FOR FILTRATION OF FORMATION LIQUID AND PROTECTION OF THE PUMP AGAINST MECHANICAL IMPURITIES IN WELLS AFTER HYDRAULIC FRACTURING AT THE INITIAL MOMENT OF ESP OPERATION. STRUCTURALLY CONSISTS OF TWO PARTS: SLUDGE CATCH BODY | 65.4 | 754 | Egypt | C HURGHADA | LUKOIL EPU SERVICE LLC |
1/28/2022 | 8413702900 | PUMP LIQUID CENTRIFUGAL SUBMERSIBLE, BOREHOLE TYPE ESP, MULTI-STAGE. INTENDED FOR PUMPING OF FORMATION LIQUID FROM OIL WELLS. IS A PART OF THE ESP INSTALLATION (ELECTRIC CENTRIFUGAL PUMP INSTALLATION). FOR USE IN | 1241 | 36004 | Egypt | C HURGHADA | LUKOIL EPU SERVICE LLC |
1/11/2022 | 8413702900 | SUBMERSIBLE CENTRIFUGAL VORTEX, MULTISTAGE PUMPS, FLOW METER - NO. DESIGNED FOR PUMPING OF FORMATION LIQUID FROM WELLS. APPLICATION PETROLEUM INDUSTRY. | 6478 | 213706.3 | Egypt | ALEXANADRIA | BISCOM INTERNATIONAL AG ON ORDER FOR CJSC NOVOMET PERM |
1/13/2022 | 8413910008 | PARTS OF SUBMERSIBLE PUMP INSTALLATIONS. ARE DESIGNED FOR SUPPLY OF FORMATION LIQUID TO THE PUMP AND ITS WORK ON PUMPING OF FORMATION LIQUID FROM WELLS. AVAILABILITY OF THE FLOW METER - NO. APPLICATION PETROLEUM INDUSTRY. | 34.5 | 640.34 | Egypt | CAIRO | BISCOM INTERNATIONAL AG ON ORDER FOR CJSC NOVOMET PERM |
1/11/2022 | 8413910008 | PARTS OF SUBMERSIBLE PUMP INSTALLATIONS. ARE DESIGNED FOR SUPPLY OF FORMATION LIQUID TO THE PUMP AND ITS WORK ON PUMPING OF FORMATION LIQUID FROM WELLS. AVAILABILITY OF THE FLOW METER - NO. APPLICATION PETROLEUM INDUSTRY. | 275 | 12003.4 | Egypt | ALEXANADRIA | BISCOM INTERNATIONAL AG ON ORDER FOR CJSC NOVOMET PERM |