1/18/2022 | 8204110000 | SET OF WRENCH MANUAL, COMBINED NON-ADJUSTABLE IN INDIVIDUAL PLASTIC PACKAGING WITH HOLDER. (WITHOUT INSULATING HANDLES AND NOT SUITABLE FOR WORK IN ELECTRICAL INSTALLATIONS WITH VOLTAGE UP TO 1000V). MATERIAL STEEL.NOT MILITARY FUNCTIONS: | 16.5 | 94.88 | Abkhazia | SOCHI | PROMTECH LLC |
1/25/2022 | 8204120000 | LEVER PIPE WRENCHES-HAND TOOLS ALLOWING TO CLAMP THE MALE PART BY THE LEVER PRINCIPLE, WITHOUT INSULATING HANDLES. NOT SUITABLE FOR WORK IN ELECTRICAL INSTALLATIONS WITH VOLTAGE UP TO 1000 V. NOT MILITARY. FUNCTIONS: | 2.54 | 32.06 | Abkhazia | SOCHI | PROMTECH LLC |
1/21/2022 | 8204110000 | DOUBLE-SIDED OPEN WRENCH 1/2, 9/16. POSITION 122. INCLUDED IN THE INSTALLATION KIT KI-1. FOR INSTALLATION AND MAINTENANCE OF ESP UNIT (ELECTRIC CENTRIFUGAL PUMP INSTALLATION). FOR USE IN THE OIL INDUSTRY (PETROLEUM PRODUCTION). | 0.25 | 15.6 | Egypt | C HURGHADA | LUKOIL EPU SERVICE LLC |
1/21/2022 | 8204110000 | WRENCH MANUAL. POSITIONS 72, 126. FOR INSTALLATION AND MAINTENANCE OF THE ESP UNIT (ELECTRIC CENTRIFUGAL PUMP INSTALLATION). FOR USE IN THE OIL INDUSTRY (PETROLEUM PRODUCTION). | 2.1 | 65.62 | Egypt | C HURGHADA | LUKOIL EPU SERVICE LLC |
1/21/2022 | 8204110000 | REINFORCED OPEN WRENCH 14X17MM. POSITION 60. FOR INSTALLATION AND MAINTENANCE OF THE ESP UNIT (ELECTRIC CENTRIFUGAL PUMP UNIT). FOR USE IN THE OIL INDUSTRY (PETROLEUM PRODUCTION). | 0.32 | 19.63 | Egypt | C HURGHADA | LUKOIL EPU SERVICE LLC |
1/21/2022 | 8204110000 | DOUBLE-SIDED OPEN WRENCH. POSITIONS 64, 66, 69. FOR INSTALLATION AND MAINTENANCE OF THE ESP UNIT (ELECTRIC CENTRIFUGAL PUMP UNIT). FOR USE IN THE OIL INDUSTRY (PETROLEUM PRODUCTION). | 0.71 | 25.04 | Egypt | C HURGHADA | LUKOIL EPU SERVICE LLC |
1/21/2022 | 8204110000 | NON-ADJUSTABLE MANUAL WRENCH 10 PCS. POSITIONS 58, 61, 63, 67, 68, 70. FOR INSTALLATION AND MAINTENANCE OF THE ESP UNIT (ELECTRIC CENTRIFUGAL PUMP UNIT). FOR USE IN THE OIL INDUSTRY (PETROLEUM PRODUCTION). | 1.15 | 30.88 | Egypt | C HURGHADA | LUKOIL EPU SERVICE LLC |
1/21/2022 | 8204110000 | WRENCH MANUAL COMBINED 14MM. POSITION 59. FOR INSTALLATION AND MAINTENANCE OF THE ESP UNIT (ELECTRIC CENTRIFUGAL PUMP UNIT). FOR USE IN THE OIL INDUSTRY (PETROLEUM PRODUCTION). | 0.18 | 6.65 | Egypt | C HURGHADA | LUKOIL EPU SERVICE LLC |
1/21/2022 | 8204110000 | WRENCH 14X17 DOUBLE-SIDED OPEN. POSITION 65. FOR INSTALLATION AND MAINTENANCE OF THE ESP UNIT (ELECTRIC CENTRIFUGAL PUMP UNIT). FOR USE IN THE OIL INDUSTRY (PETROLEUM PRODUCTION). | 0.2 | 10.5 | Egypt | C HURGHADA | LUKOIL EPU SERVICE LLC |
1/21/2022 | 8204110000 | WRENCH 24X27 DOUBLE-ENDED OPEN. POSITION 62. FOR INSTALLATION AND MAINTENANCE OF THE ESP UNIT (ELECTRIC CENTRIFUGAL PUMP UNIT). FOR USE IN THE OIL INDUSTRY (PETROLEUM PRODUCTION). | 0.3 | 10.47 | Egypt | C HURGHADA | LUKOIL EPU SERVICE LLC |