1/21/2022 | 8203400000 | MANUAL PIPE BEVELER. POSITION 124. INCLUDED IN INSTALLATION KIT KI-1. FOR INSTALLATION AND MAINTENANCE OF ESP UNIT (ELECTRIC CENTRIFUGAL PUMP INSTALLATION). FOR USE IN THE OIL INDUSTRY (PETROLEUM PRODUCTION). | 0.2 | 111.49 | Egypt | C HURGHADA | LUKOIL EPU SERVICE LLC |
1/21/2022 | 8203300000 | SCISSORS FOR CUTTING THE CABLE INSULATED. SERIES STANDARD . POSITION 89. FOR INSTALLATION AND MAINTENANCE OF THE ESP UNIT (ELECTRIC CENTRIFUGAL PUMP UNIT). FOR USE IN THE OIL INDUSTRY (PETROLEUM PRODUCTION). | 1 | 50.92 | Egypt | C HURGHADA | LUKOIL EPU SERVICE LLC |
1/21/2022 | 8203300000 | METAL SHEARS 260MM KRAFTOOL 2325-L. POSITION 77. FOR INSTALLATION AND MAINTENANCE OF THE ESP UNIT (ELECTRIC CENTRIFUGAL PUMP UNIT). FOR USE IN THE OIL INDUSTRY (PETROLEUM PRODUCTION). | 0.55 | 108.74 | Egypt | C HURGHADA | LUKOIL EPU SERVICE LLC |
1/21/2022 | 8203200009 | HAND TOOL PLIERS. POSITIONS 81, 85, 90, 107. INTENDED FOR INSTALLATION AND MAINTENANCE OF THE ESP UNIT (ELECTRIC CENTRIFUGAL PUMP UNIT). FOR USE IN THE OIL INDUSTRY (PETROLEUM PRODUCTION). | 2.26 | 203.98 | Egypt | C HURGHADA | LUKOIL EPU SERVICE LLC |
1/21/2022 | 8203300000 | METAL-INSULATED HACKSAW. POSITION 99. FOR INSTALLATION AND MAINTENANCE OF THE ESP UNIT (ELECTRIC CENTRIFUGAL PUMP UNIT). FOR USE IN THE OIL INDUSTRY (PETROLEUM PRODUCTION). | 0.44 | 90.43 | Egypt | C HURGHADA | LUKOIL EPU SERVICE LLC |
1/21/2022 | 8203200009 | POLYMER INSULATING PLIERS UP TO 1000 V. POSITION 91. FOR INSTALLATION AND MAINTENANCE OF ESP UNIT (ELECTRIC CENTRIFUGAL PUMP INSTALLATION). FOR USE IN THE OIL INDUSTRY (PETROLEUM PRODUCTION). | 0.24 | 7.36 | Egypt | C HURGHADA | LUKOIL EPU SERVICE LLC |
1/21/2022 | 8203200009 | PRESSING PLIERS NICOPRESS 53-XPJ. POSITION 43. ARE USED TO CREATE THE MAXIMUM FLOW OF THE METAL OF THE CONNECTING CLUTCH AROUND THE WIRE OR CABLE. FOR ASSEMBLY AND INSTALLATION OF COMPONENTS OF THE UNIT OF THE ESP (INSTALLATION OF THE ELECTRIC CENTRIFUGAL PUMP). FOR | 5.2 | 1246.62 | Egypt | C HURGHADA | LUKOIL EPU SERVICE LLC |
1/21/2022 | 8203100000 | FILE FLAT BLUNT 250 MM ?2. POSITION 74. FOR INSTALLATION AND MAINTENANCE OF THE ESP UNIT (ELECTRIC CENTRIFUGAL PUMP UNIT). FOR USE IN THE OIL INDUSTRY (PETROLEUM PRODUCTION). | 0.6 | 7.25 | Egypt | C HURGHADA | LUKOIL EPU SERVICE LLC |
1/21/2022 | 8203200009 | CLAMP MANUAL REINFORCED, FLAT GRIP 225MM. POSITION 82. FOR INSTALLATION AND MAINTENANCE OF THE ESP UNIT (ELECTRIC CENTRIFUGAL PUMP UNIT). FOR USE IN THE OIL INDUSTRY (PETROLEUM PRODUCTION). | 1 | 64.58 | Egypt | C HURGHADA | LUKOIL EPU SERVICE LLC |