1/24/2022 | 3824999608 | AUXILIARY LABORATORY REAGENTS FOR SAMPLE PREPARATION AND TESTING FOR SCIENTIFIC RESEARCH PURPOSES, OKPD-2 20.59.52.194 | 0.6 | 687.34 | United States of America | MOSCOW RUSSIA | CJSC BIOCHIMMAK |
1/24/2022 | 3824999608 | LABORATORY REAGENTS DESIGNED FOR USE FOR SCIENTIFIC RESEARCH PURPOSES AS AUXILIARY REAGENTS FOR SAMPLE PREPARATION AND TESTING, OKPD-2 20.59.52.194 | 0.25 | 16.18 | Netherlands | MOSCOW RUSSIA | CJSC BIOCHIMMAK |
1/27/2022 | 3824999608 | AUXILIARY LABORATORY REAGENTS FOR SAMPLE PREPARATION AND TESTING FOR SCIENTIFIC RESEARCH PURPOSES, OKPD-2 20.59.52.194 | 1.2 | 113.47 | Lithuania | MOSCOW RUSSIA | CJSC BIOCHIMMAK |
1/27/2022 | 3824999608 | AUXILIARY LABORATORY REAGENTS FOR SAMPLE PREPARATION AND TESTING FOR SCIENTIFIC RESEARCH PURPOSES, OKPD-2 20.59.52.194 | 0.5 | 187.35 | United Kingdom | MOSCOW RUSSIA | CJSC BIOCHIMMAK |
1/27/2022 | 3824999608 | AUXILIARY LABORATORY REAGENTS FOR SAMPLE PREPARATION AND TESTING FOR SCIENTIFIC RESEARCH PURPOSES, OKPD-2 20.59.52.194 | 6 | 4501.55 | United States of America | MOSCOW RUSSIA | CJSC BIOCHIMMAK |
1/11/2022 | 3824999609 | DRILLING FLUID ADDITIVE GELTONE II IS USED IN THE OIL AND GAS COMPLEX FOR THE PREPARATION OF DRILLING FLUID DURING THE CONSTRUCTION (DRILLING) OF WELLS, WHEN CARRYING OUT PLUGGING WORKS, WHEN TESTING, DEVELOPING AND REPAIRING WELLS, WHEN CARRYING OUT | 145952 | 306266.3 | Egypt | Unknown | BRANCH OF THE COMPANY HALLIBURTON INTERNATIONAL GMBH SWISS CONFEDERATION |
1/25/2022 | 3824999608 | DRILLING FLUID ADDITIVE GELTONE II IS USED IN THE OIL AND GAS COMPLEX FOR THE PREPARATION OF DRILLING FLUID DURING THE CONSTRUCTION (DRILLING) OF WELLS, WHEN CARRYING OUT PLUGGING WORKS, WHEN TESTING, DEVELOPING AND REPAIRING WELLS, WHEN CARRYING OUT | 27366 | 80534.8 | Egypt | Unknown | BRANCH OF THE COMPANY HALLIBURTON INTERNATIONAL GMBH SWISS CONFEDERATION |
1/24/2022 | 3824999608 | ADDITIVE FOR DRILLING FLUID BARADEMUL W-461 , FOR USE IN THE OIL AND GAS COMPLEX DURING THE CONSTRUCTION (DRILLING) OF WELLS, WHILE PLUGGING WORKS AT WELLS, DURING TESTING, DEVELOPING, REPAIRING WELLS, WHILE CARRYING OUT HYDRAULIC FRACTURING, | 16192 | 265948.6 | Belgium | Unknown | BRANCH OF THE COMPANY HALLIBURTON INTERNATIONAL GMBH SWISS CONFEDERATION |
1/18/2022 | 3824999208 | ADDITIVE TO DRILLING MUD BARACOR 100 IS USED IN THE OIL AND GAS COMPLEX FOR THE PREPARATION OF SOLUTIONS DURING THE CONSTRUCTION (DRILLING) OF WELLS, WHEN PLUGGING WORKS AT WELLS, TESTING, DEVELOPING AND REPAIRING WELLS, AS WELL AS | 33824 | 48726.7 | India | UNKNOWN | BRANCH OF THE COMPANY HALLIBURTON INTERNATIONAL GMBH SWISS CONFEDERATION |
1/25/2022 | 3824509000 | MORTAR PCI REPAFLOW 20 KG, USED FOR CONCRETE FOUNDATION CONNECTION WITH TESTING MACHINES, HAMPERS, INCLUDED WITH STEEL EMBEDDED PART FOR HIT450P PENDULUM HEADPER, SUPPLIED AS SAMPLE FOR PURPOSES | 40 | 284.62 | Germany | ULM | RUSSIAN STATE UNIVERSITY OF OIL AND GAS NRU NAMED AFTER I M GUBKIN ON INSTRUCTIONS OF OM TRADING LLC |