1/30/2022 | 8544499108 | CONNECTING CABLE CONSISTING OF INSULATED CORE CONNECTED WITH A COMMON EXTERNAL TEFLON INSULATION, NOT EQUIPPED WITH CONNECTING DEVICES. THE GOODS ARE IMPORTED IN A SINGLE QUANTITY, INTENDED TO PERFORM REPAIR WORKS CHP-27 , | 17 | 568.6 | Poland | CHELOBITIEVO | GAS SYSTEMS JSC |
1/10/2022 | 8544499108 | ELECTRIC POWER CABLE WITH PVC INSULATION IN COILS IS IMPORTED AS A SAMPLE FOR THE PURPOSES OF CERTIFICATION | 4 | 14.61 | China | SUIFENHE CHINA | TRADING UNION LLC |
1/10/2022 | 8544499108 | WIRES AND CABLES WITH INSULATED CONDUCTORS WITH A DIAMETER OF MORE THAN 0.51 MM, FOR VOLTAGE UP TO 1000 V, SPARE PARTS FOR MAINTENANCE AND REPAIR OF PREVIOUSLY IMPORTED CERTIFIED TECHNOLOGY. EQUIPMENT TETRA PAK FOR THE FOOD INDUSTRY, OKP CODE 513220, : | 33.94 | 657.16 | France | MOSCOW RUSSIA | TETRA PAK JSC |
1/27/2022 | 8544499108 | CABLES WITH INSULATED CONDUCERS, DIAMETER MORE THAN 0.51 MM, FOR VOLTAGE UP TO 1000 V, WITHOUT CONNECTORS, ARE INTENDED FOR EQUIPMENT OF THE PLANT FOR PRODUCTION, STORAGE, LOADING OF LNG AND SGK AT GBS. IMPORTED FOR CONSTRUCTION | 12961.2 | 102031.9 | France | GYDAN PENINSULA | ARKHMORTORGPORT OJSC FOR OJSC YAMAL LNG |
1/20/2022 | 8544499108 | CABLE WITH INSULATED CONDUCERS, DIAMETER MORE THAN 0.51MM, WITHOUT CONNECTORS, VOLTAGE UP TO 1000 V, FOR EQUIPMENT OF PLANT FOR PRODUCTION, STORAGE, LOADING OF LNG AND SGK AT GBS. IMPORTED AS PART OF THE CONSTRUCTION OF THE LNG PLANT PROJECT | 5.18 | 590.36 | Italy | GYDAN PENINSULA | ARKTIK LNG 2 LLC |
1/27/2022 | 8544499108 | CABLES WITH INSULATED CONDUCERS, DIAMETER MORE THAN 0.51 MM, FOR VOLTAGE UP TO 1000 V, WITHOUT CONNECTORS, ARE INTENDED FOR EQUIPMENT OF THE PLANT FOR PRODUCTION, STORAGE, LOADING OF LNG AND SGK AT GBS. IMPORTED FOR CONSTRUCTION | 16138 | 125662.9 | Turkey | GYDAN PENINSULA | ARKHMORTORGPORT OJSC FOR OJSC YAMAL LNG |
1/20/2022 | 8544499108 | CABLE WITH INSULATED CONDUCERS, DIAMETER MORE THAN 0.51MM, WITHOUT CONNECTORS, VOLTAGE UP TO 1000 V, FOR EQUIPMENT OF PLANT FOR PRODUCTION, STORAGE, LOADING OF LNG AND SGK AT GBS. IMPORTED AS PART OF THE CONSTRUCTION OF THE LNG PLANT PROJECT | 334 | 4126.12 | Turkey | GYDAN PENINSULA | ARKTIK LNG 2 LLC |
1/27/2022 | 8544499108 | CABLES WITH INSULATED CONDUCERS, DIAMETER MORE THAN 0.51 MM, FOR VOLTAGE UP TO 1000 V, WITHOUT CONNECTORS, ARE INTENDED FOR EQUIPMENT OF THE PLANT FOR PRODUCTION, STORAGE, LOADING OF LNG AND SGK AT GBS. IMPORTED FOR CONSTRUCTION | 14432 | 111014.9 | Turkey | GYDAN PENINSULA | ARKHMORTORGPORT OJSC FOR OJSC YAMAL LNG |
1/27/2022 | 8544499108 | CABLES WITH INSULATED CONDUCERS, DIAMETER MORE THAN 0.51 MM, FOR VOLTAGE UP TO 1000 V, WITHOUT CONNECTORS, ARE INTENDED FOR EQUIPMENT OF THE PLANT FOR PRODUCTION, STORAGE, LOADING OF LNG AND SGK AT GBS. IMPORTED FOR CONSTRUCTION | 15393 | 118597.9 | Turkey | GYDAN PENINSULA | ARKHMORTORGPORT OJSC FOR OJSC YAMAL LNG |
1/21/2022 | 8544499108 | CABLE WITH INSULATED CONDUCERS, DIAMETER MORE THAN 0.51MM, WITHOUT CONNECTORS, VOLTAGE UP TO 1000 V, FOR EQUIPMENT OF PLANT FOR PRODUCTION, STORAGE, LOADING OF LNG AND SGK AT GBS. IMPORTED AS PART OF THE CONSTRUCTION OF THE LNG PLANT PROJECT | 258.41 | 1106.91 | China | MURMANSK AIRPORT | ARKTIK LNG 2 LLC |