1/27/2022 | 7326909409 | PARTS FOR INDUSTRIAL ASSEMBLY OF VEHICLE NISSAN X-TRAIL/QASHQAI/MURANO - STAMPED STEEL BRACKET FOR FIXING THE HOOD OPENING CABLE | 4 | 161.9 | Japan | ST PETERSBURG RUSSIA | NISSAN MANUFACTURING RUS LLC |
1/26/2022 | 7326909409 | PARTS FOR INDUSTRIAL ASSEMBLY OF VEHICLE NISSAN X-TRAIL/QASHQAI/MURANO - STAMPED STEEL BRACKET FOR FIXING THE HOOD OPENING CABLE | 4 | 163.8 | Japan | ST PETERSBURG RUSSIA | NISSAN MANUFACTURING RUS LLC |
1/27/2022 | 7326909409 | PARTS FOR INDUSTRIAL ASSEMBLY OF VEHICLE NISSAN X-TRAIL/QASHQAI/MURANO - STAMPED STEEL BRACKET FOR FIXING THE HOOD OPENING CABLE | 4 | 161.9 | Japan | ST PETERSBURG RUSSIA | NISSAN MANUFACTURING RUS LLC |
1/2/2022 | 7326909409 | PARTS FOR INDUSTRIAL ASSEMBLY OF VEHICLE NISSAN X-TRAIL/QASHQAI/MURANO - STAMPED STEEL BRACKET FOR FIXING THE HOOD OPENING CABLE | 4 | 161.4 | Japan | ST PETERSBURG RUSSIA | NISSAN MANUFACTURING RUS LLC |
1/8/2022 | 7326909409 | PARTS FOR INDUSTRIAL ASSEMBLY OF VEHICLE NISSAN X-TRAIL/QASHQAI/MURANO - STAMPED STEEL BRACKET FOR FIXING THE HOOD OPENING CABLE | 4 | 162 | Japan | ST PETERSBURG RUSSIA | NISSAN MANUFACTURING RUS LLC |
1/13/2022 | 7326909409 | PARTS FOR INDUSTRIAL ASSEMBLY OF VEHICLE NISSAN X-TRAIL/QASHQAI/MURANO - STAMPED STEEL BRACKET FOR FIXING THE HOOD OPENING CABLE | 4 | 163.5 | Japan | ST PETERSBURG RUSSIA | NISSAN MANUFACTURING RUS LLC |
1/5/2022 | 7326909409 | PARTS FOR INDUSTRIAL ASSEMBLY OF VEHICLE NISSAN X-TRAIL/QASHQAI/MURANO - STAMPED STEEL BRACKET FOR FIXING THE HOOD OPENING CABLE | 4 | 161.7 | Japan | ST PETERSBURG RUSSIA | NISSAN MANUFACTURING RUS LLC |
1/14/2022 | 7326909409 | CABLE DRAW 35X1.2 MM-3 pcs. IS A STEEL RECTANGULAR PRODUCT WORKING IN PAIR WITH AN ARCH IDENTICAL DRAWING AND WITH A TECHNOLOGICAL HOLE BETWEEN THE DRAWINGS. SERVES FOR ASSEMBLY OF METAL CORD INTO ONE BEAM UNCOILED FROM MULTIPLE spacecraft | 0.44 | 266.58 | Luxembourg | KAZINKA GRYAZINSKY DISTRICT LIPETSK REGION | BEKART LIPETSK LLC |
1/5/2022 | 7326909409 | CANIFAS-BLOCK OF FERROUS METALS, STAMPED FROM STEEL, SERVES TO CHANGE THE DIRECTION OF THE CABLE DRIVE DURING LOAD-LIFTING AND OTHER WORK ON THE SHIP. MANUFACTURING METHOD: STAMPING, ASSEMBLY. MAX.WORKING LOAD: 3 TONS. TOTAL: 4 PCS THE GOODS ARE IMPORTED IN RAM | 29.04 | 178.9 | South Korea | PETROPAVLOVSK KAMCHATSKY ELIZO AIRPORT | PETROPAVLOVSK KAMCHATSK FISH CANNING PLANT LLC |