| 1/19/2022 | 8481401000 | REGULATING VALVE 25CH945NZH DU50 RU16KV25 - 1 pc. INTENDED FOR INSTALLATION AS A REGULATORY BODY IN SYSTEMS OF AUTOMATIC CONTROL OF AUTOMATIC PROCESSES AND IS MADE OF CAST IRON. NOMINAL PRESSURE 0.5 MPa. FINITE | 20 | 477.64 | Ukraine | ROSTOV ON DON | TRADING HOUSE OF PELMENI AND KEFIR LLC |
| 1/29/2022 | 8481109908 | TIMING PHASE CHANGING VALVE. CONTROL IS OCCURRED THROUGH A SOLENOID VALVE, THE OIL SUPPLY TO WHICH IS REGULATED BY ELECTRONIC SIGNALS WITH A DISCRETE FREQUENCY OF 0 OR 250 Hz. THIS ENTIRE PROCESS IS CONTROLLED BY THE ELECTRONIC CONTROL UNIT ON THE BASIS | 0.53 | 14.34 | Ukraine | ROSTOV ON DON | MULTIMODAL PLUS LLC |
| 1/20/2022 | 8481807399 | SHUT-OFF VALVES FROM STEEL - VALVE BLOCKS. USED IN SYSTEMS OF AUTOMATIC CONTROL WHEN CONNECTING PRESSURE SENSORS TO IMPULSE LINES, IN SYSTEMS OF REGULATION AND CONTROL OF VARIOUS TECHNOLOGICAL PROCESSES | 2 | 464.95 | Ukraine | ROSTOV ON DON | ENGLER LLC |
| 1/21/2022 | 8481806900 | PARTS OF EQUIPMENT FOR THE FOOD INDUSTRY (MEAT AND POULTRY PROCESSING), FROM BASE METALS: | 0.8 | 548.76 | Ukraine | KRASNODAR CITY | MIGRU LLC |
| 1/12/2022 | 8481809907 | SHOPPER HP-300 U1 IS INTENDED TO PREVENT LOSS OF OIL AND PETROLEUM PRODUCTS FROM THE TANK IN CASES OF PROCESS PIPELINES BREAK OR SHUT-OFF DEVICES PLACED ON IT FAILURE | 50 | 323.9 | Azerbaijan | NOVOKUIBYSHEVSKAYA | CJSC SPTO NEFTEKHIMPROEKT |
| 1/12/2022 | 8481809907 | CLAPPER HP-400 U1 WITH MU-2 CONTROL MECHANISM WITH ELECTRIC DRIVE. DESIGNED TO PREVENT LOSS OF OIL AND PETROLEUM PRODUCTS FROM THE RESERVOIR IN CASES OF PROCESS PIPELINES BREAK OR SHUT-OFF DEVICES PLACED ON IT FAILURE | 453 | 5081.96 | Azerbaijan | NOVOKUIBYSHEVSKAYA | CJSC SPTO NEFTEKHIMPROEKT |
| 1/12/2022 | 8481809907 | SLAPPER HP-300 U1 WITH MU-2 CONTROL MECHANISM WITH ELECTRIC DRIVE IS INTENDED TO PREVENT LOSS OF OIL AND PETROLEUM PRODUCTS FROM THE TANK IN CASES OF PROCESS PIPELINES BREAK OR SHUT-OFF DEVICES PLACED ON IT FAILURE | 182 | 2410.19 | Azerbaijan | NOVOKUIBYSHEVSKAYA | CJSC SPTO NEFTEKHIMPROEKT |
| 1/12/2022 | 8481809907 | SLAPPER HP-250 U1 WITH MU-1 CONTROL MECHANISM WITH MANUAL DRIVE IS INTENDED TO PREVENT LOSS OF OIL AND PETROLEUM PRODUCTS FROM THE TANK IN CASES OF PROCESS PIPING BREAK OR SHUT-OFF DEVICES PLACED ON IT FAILURE | 51 | 314.08 | Azerbaijan | NOVOKUIBYSHEVSKAYA | CJSC SPTO NEFTEKHIMPROEKT |
| 1/12/2022 | 8481809907 | SLAPPER HP-400 U1 WITH A MU-2RCH CONTROL MECHANISM WITH A MANUAL DRIVE IS INTENDED TO PREVENT LOSS OF OIL AND PETROLEUM PRODUCTS FROM THE TANK IN CASES OF PROCESS PIPELINES BREAK OR SHUT-OFF DEVICES PLACED ON IT FAILURE | 375 | 3850.11 | Azerbaijan | NOVOKUIBYSHEVSKAYA | CJSC SPTO NEFTEKHIMPROEKT |
| 1/14/2022 | 8481807399 | SHUT-OFF VALVE (DEFECTIVE, REMOVED FROM AIRCRAFT). INTENDED TO SHUT OFF THE AIR BLEEDING LINE FROM THE AUXILIARY POWER UNIT (APU) FOR LAUNCHING AIRPLANE PROCESSING TURBOJET ENGINES. MADE OF STEEL, CHANNEL DIAMETER 100 MM. | 6 | 48086.2 | Germany | DOMODEDOVO AIRPORT MOSCOW | AIRLINE ROYAL FLIGHT JSC |