| 1/20/2022 | 8409910008 | EVAPORATOR REDUCER DESIGNED FOR USE WITH AN INTERNAL COMBUSTION ENGINE WITH PARK IGNITION USING LIQUEFIED PETROLEUM GAS AS A FUEL FOR PREPARING THE AIR-FUEL MIXTURE AND SUPPLYING IT TO THE COMBUSTION CHAMBER | 66 | 1771.43 | Ukraine | UNKNOWN | BELANOV YURI NIKOLAEVICH |
| 1/21/2022 | 8419500000 | PIPE (COOLING) SYSTEM IS USED FOR DRAINAGE AND CONTROL OF THE CONDITION OF MECHANICAL SEALS OF INDUSTRIAL PUMPS, DESIGNED FOR PUMPING PETROLEUM PRODUCTS, LIQUEFIED CARBON | 110 | 3677.7 | Ukraine | MOSCOW RUSSIA | TREM ENGINEERING JSC |
| 1/29/2022 | 8413910008 | SECTIONS OF A SUBMERSIBLE CENTRIFUGAL PUMP, FIELD OF APPLICATION IN THE OIL PRODUCING INDUSTRY, INTENDED FOR PUMPING OF FORMATION LIQUID (MIXTURE OF OIL ASSOCIATED WATER AND PETROLEUM GAS) WITH A MAXIMUM DENSITY OF 1400 KG/M3 | 417 | 2020.89 | Ukraine | ALMETYEVSK 10 | RIMERA ALNAS LLC |
| 1/27/2022 | 8419899890 | LABORATORY THERMOSTAT VISCOMETRIC. PURPOSE: PRECISE MAINTENANCE OF THE SET TEMPERATURE WHEN DETERMINING THE VISCOSITY OF PETROLEUM PRODUCTS ACCORDING TO GOST 33-2016 IN THE TEMPERATURE RANGE FROM 0 TO +152 ░ C. FIELD OF APPLICATION: GENERAL INDUSTRIAL | 15 | 1283.62 | Uzbekistan | TASHKENT | LABORATORY EQUIPMENT AND INSTRUMENTS JSC |
| 1/27/2022 | 8419400009 | LABORATORY APPARATUS. PURPOSE: DETERMINATION OF THE FRACTIONAL COMPOSITION OF PETROLEUM PRODUCTS AT ATMOSPHERIC PRESSURE IN ACCORDANCE WITH GOS 2177-99, GOST ISO 3405-2013, GOST R EN ISO 3405-2007, GOST R 53707-2009, ASTM D86-17, ASTM D1078-11. APPLICATION AREA: | 71 | 7930.41 | Uzbekistan | TASHKENT | LABORATORY EQUIPMENT AND INSTRUMENTS JSC |
| 1/12/2022 | 8481409009 | COMBINED BREATHING/SAFETY VALVE KDS-3000/500 U1 IS INTENDED FOR SEALING THE GAS SPACE OF RESERVOIRS WITH OIL AND PETROLEUM PRODUCTS AND MAINTAIN PRESSURE IN THIS SPACE WITHIN THE SET LIMITS. KDS CAN BE OPERATING | 155 | 1109.13 | Azerbaijan | NOVOKUIBYSHEVSKAYA | CJSC SPTO NEFTEKHIMPROEKT |
| 1/12/2022 | 8481809907 | SHOPPER HP-300 U1 IS INTENDED TO PREVENT LOSS OF OIL AND PETROLEUM PRODUCTS FROM THE TANK IN CASES OF PROCESS PIPELINES BREAK OR SHUT-OFF DEVICES PLACED ON IT FAILURE | 50 | 323.9 | Azerbaijan | NOVOKUIBYSHEVSKAYA | CJSC SPTO NEFTEKHIMPROEKT |
| 1/12/2022 | 8481809907 | CLAPPER HP-400 U1 WITH MU-2 CONTROL MECHANISM WITH ELECTRIC DRIVE. DESIGNED TO PREVENT LOSS OF OIL AND PETROLEUM PRODUCTS FROM THE RESERVOIR IN CASES OF PROCESS PIPELINES BREAK OR SHUT-OFF DEVICES PLACED ON IT FAILURE | 453 | 5081.96 | Azerbaijan | NOVOKUIBYSHEVSKAYA | CJSC SPTO NEFTEKHIMPROEKT |
| 1/12/2022 | 8481809907 | SLAPPER HP-300 U1 WITH MU-2 CONTROL MECHANISM WITH ELECTRIC DRIVE IS INTENDED TO PREVENT LOSS OF OIL AND PETROLEUM PRODUCTS FROM THE TANK IN CASES OF PROCESS PIPELINES BREAK OR SHUT-OFF DEVICES PLACED ON IT FAILURE | 182 | 2410.19 | Azerbaijan | NOVOKUIBYSHEVSKAYA | CJSC SPTO NEFTEKHIMPROEKT |
| 1/12/2022 | 8481809907 | SLAPPER HP-250 U1 WITH MU-1 CONTROL MECHANISM WITH MANUAL DRIVE IS INTENDED TO PREVENT LOSS OF OIL AND PETROLEUM PRODUCTS FROM THE TANK IN CASES OF PROCESS PIPING BREAK OR SHUT-OFF DEVICES PLACED ON IT FAILURE | 51 | 314.08 | Azerbaijan | NOVOKUIBYSHEVSKAYA | CJSC SPTO NEFTEKHIMPROEKT |