1/29/2022 | 7315119000 | THE TIMING CHAIN SET IS RESPONSIBLE FOR THE STABLE OPERATION OF THE ENGINE GAS DISTRIBUTION SYSTEM. THE GRM IS DESIGNED FOR TIMELY SUPPLY OF THE FUEL MIXTURE OR AIR TO THE ENGINE CYLINDERS, AND ALSO FOR THE EXHAUST EXHAUST GASES. INCLUDED IN THE SET | 1.51 | 25.64 | Ukraine | ROSTOV ON DON | MULTIMODAL PLUS LLC |
1/24/2022 | 7302102200 | BROAD GAUGE RAILWAY, INTENDED FOR OPERATION ON RAILWAYS OF GENERAL AND NON-PUBLIC USE, WIDE-SOLID. RAILS DESIGNED FOR STRAIGHT AND FLAT CURVES OF LINKED AND JOINTED RAILWAY | 20275 | 29109.9 | Ukraine | G ALCHEVSK | SOYUZMETALLSERVICE LLC |
1/24/2022 | 7302102200 | BROAD GAUGE RAILWAY, INTENDED FOR OPERATION ON RAILWAYS OF GENERAL AND NON-PUBLIC USE, WIDE-SOLID. RAILS DESIGNED FOR STRAIGHT AND FLAT CURVES OF LINKED AND JOINTED RAILWAY | 20275 | 29109.9 | Ukraine | G ENAKIEVO | SOYUZMETALLSERVICE LLC |
1/19/2022 | 7308909809 | TECHNONICOL ROOF GUARD, SPECIAL ROOF GUARD IS INTENDED TO ENSURE PEOPLE'S SAFETY DURING OPERATION OF THE ROOF, WHILE CARRYING OUT WORK ON ITS MAINTENANCE AND REPAIR. FASTENING THE FENCE IS MADE IN THE VERTICAL PART | 988 | 2582.31 | Ukraine | ZAPOROZHIE UKRAINE | TECHNONICOL BUILDING SYSTEMS LLC |
1/26/2022 | 7315890000 | CHAIN SLING IS DESIGNED FOR LOAD-LIFT OPERATIONS IN WAREHOUSES | 550 | 6015.86 | Ukraine | G TAGANROG | IE Yushko Kirill Alexandrovich |
1/21/2022 | 7320208108 | SPRING ?12.02.00.012-650 pcs. SERVES TO COMPRESS THE P30.02.040 MEMBRANE DURING THE OPERATION OF THE PULMONARY AUTOMATIC DEVICE. COMPRESSION SPRING. OUTSIDE DIAMETER - 4.6MM LENGTH - 8MM. MATERIAL:PRO | 0.1 | 1075.8 | Ukraine | GUY | YUZHNO URALSKIY PLANT OF RESCUE EQUIPMENT LLC |
1/21/2022 | 7302102200 | BROAD GAUGE RAILWAY, INTENDED FOR OPERATION ON RAILWAYS OF GENERAL AND NON-PUBLIC USE, WIDE-SOLID. RAILS DESIGNED FOR STRAIGHT AND FLAT CURVES OF LINKED AND JOINTED RAILWAY | 20275 | 29205.6 | Ukraine | G MAKEEVKA | SOYUZMETALLSERVICE LLC |
1/17/2022 | 7326903000 | STAIRS OF FERROUS METALS, MATERIAL OF MANUFACTURE - ST 3 STEEL, INTENDED FOR LIFT AND Descent of people on the STRUCTURE OF THE VOLUMETRIC RACK IN THE PROCESS OF INSTALLATION / DISMANTLING AND OPERATION: | 53 | 288.88 | Uzbekistan | TASHKENT | GROUP OF COMPANIES ANTEY LLC |
1/13/2022 | 7326909409 | FERROUS METAL PRODUCTS, STAMPED, INTENDED FOR USE IN THE PROCESS OF OPERATION, MAINTENANCE AND REPAIR OF TETRA PAK EQUIPMENT: | 11.86 | 1027.01 | Uzbekistan | LOBNYA CITY | TETRA PAK JSC |
1/19/2022 | 7326909807 | STEEL PRODUCT - OPERATION HANDLE. MANUFACTURED BY A COMBINED METHOD (BENDING, CUTTING, STAMPING). INTENDED EXCLUSIVELY FOR MANUAL SHUT-OFF AND DISCONNECTING OF THE LOAD SWITCH SL PRODUCED BY JSC PO ELTEHNIKA . | 38 | 307.7 | Poland | PEPOWO POLAND | PO ELTEKHNIKA JSC |