1/21/2022 | 8544601000 | CABLE EXTENSION FOR SUPPLYING THREE-PHASE ELECTRIC CURRENT THROUGH CABLE LINE TO SUBMERSIBLE ELECTRIC MOTOR OF ESP ELECTRIC CENTRIFUGAL PUMP UNIT. IS A FLAT THREE-CONDUCTOR ELECTRIC CABLE OF A SET LENGTH (50 M) ON | 300 | 7503.3 | Egypt | C HURGHADA | LUKOIL EPU SERVICE LLC |
1/21/2022 | 8544601000 | CABLE LINE FOR AC ELECTRIC VOLTAGE SUPPLY FROM SURFACE TO ESP UNIT SUBMERSIBLE ELECTRIC MOTOR. IS A SUBMERSIBLE CABLE 3X16 MM2 FOR VOLTAGE 4 KV WITH TINNED COPPER CORE, WITH INSULATION | 12680 | 105003.3 | Egypt | C HURGHADA | LUKOIL EPU SERVICE LLC |
1/21/2022 | 8203300000 | SCISSORS FOR CUTTING THE CABLE INSULATED. SERIES STANDARD . POSITION 89. FOR INSTALLATION AND MAINTENANCE OF THE ESP UNIT (ELECTRIC CENTRIFUGAL PUMP UNIT). FOR USE IN THE OIL INDUSTRY (PETROLEUM PRODUCTION). | 1 | 50.92 | Egypt | C HURGHADA | LUKOIL EPU SERVICE LLC |
1/21/2022 | 8537109800 | INSULATION RESISTANCE MEASUREMENT UNIT BP 210. POSITION 30. REPRESENTS THE PRINTED BOARD PERFORMING RECEIVING THE VALUES OF INSULATION RESISTANCE OF THE CABLE AND SUBMERSIBLE EQUIPMENT AND TRANSFER THEIR VALUES TO THE CONTROL STATION CONTROLLER. ON THE | 2 | 134.12 | Egypt | C HURGHADA | LUKOIL EPU SERVICE LLC |
1/21/2022 | 8203200009 | PRESSING PLIERS NICOPRESS 53-XPJ. POSITION 43. ARE USED TO CREATE THE MAXIMUM FLOW OF THE METAL OF THE CONNECTING CLUTCH AROUND THE WIRE OR CABLE. FOR ASSEMBLY AND INSTALLATION OF COMPONENTS OF THE UNIT OF THE ESP (INSTALLATION OF THE ELECTRIC CENTRIFUGAL PUMP). FOR | 5.2 | 1246.62 | Egypt | C HURGHADA | LUKOIL EPU SERVICE LLC |
1/21/2022 | 9017809000 | INDICATOR OF THE DIMENSIONS OF THE SPLIT, USED, OSN.0256.000. POSITION 44. IS A METAL TEMPLATE FOR CHECKING THE LINEAR DIMENSIONS OF THE CABLE LINE AND CABLE EXTENSION OF THE ESP UNIT (ELECTRIC CENTRIFUGAL PUMP INSTALLATION). FOR | 0.48 | 148.75 | Egypt | C HURGHADA | LUKOIL EPU SERVICE LLC |
1/21/2022 | 3919108000 | FILM F-4, STICKY, OIL-RESISTANT. POSITION 146. REPRESENTS AN ELECTRIC INSULATING ORIENTED FILM WITH A SINGLE-SIDED STICKY LAYER. USED IN THE PROCESS OF CABLE SPLUING. FOR INSTALLATION AND MAINTENANCE OF THE ESP UNIT (INSTALLATION | 2.65 | 368.22 | Egypt | C HURGHADA | LUKOIL EPU SERVICE LLC |